Herunterladen Inhalt Inhalt Diese Seite drucken

Product Description; Initial Operation - Geze Ts 5000 R-Ism Montageanleitung

Vorschau ausblenden Andere Handbücher für TS 5000 R-ISM:
Inhaltsverzeichnis
ENI English

Product description

The TS 5000 R-ISMglide rail is approved for installation on
double-leaffire and smoke protection doors. The guide rails
are equipped with electromechanical hold-open devices for
both door leaves that are controlled by an integrated smoke
detector
as well as a smoke
Other versions
TS5000 R-ISM/ G- electromechanical hold-open device only
on the active leaf.
TS5000 R-ISM/ S- electromechanical hold-open device only
on the fixed leaf. Equipping with TS5000 EFSon the active
leaf possible.
TS5000 R-ISM/O- no electromechanical hold-open device on
the glide rail. Hold-open mechanism is conducted externally
via the magnetic door clamp and armature plate on the leaf.
Equipping with TS5000 EFSon the
Active leaf possible.
Safety notices
Follow the document
"Instructions
missioning, operation and after-sales service maintenance
of GEZEhold-open system FAGC" for electrical connection
and commissioning (available at www.geze.com).
DANGER!
Danger of electric shock!
Electric wiring must only be carried out by professional
electricians.
Interrupt power supply! Secure against reactivation.
On site protect customer-side mains leads with safety
fuse BIO.
Use cable protection for the 230 V cable when leading
through plaster.
Insert the cable protruding from the wall through the
respective openings of the smoke switch housing only.
Technical data
Protection rating
IP rating
Ambient temperature
230 V supply cable
Supply voltage:
Operating voltage:
maximum
current
con-
sumption
Installation
details
The remarks
are intended
associated graphical installation instructions.
Drill fixing holes for door closer, guide rail, smoke
ton
switch housing (A), power supply 230V (B) and optio-
nally additional connections (C).
Follow safety precautions
ton
Lay down the power supply line 230 V starting from
toa
the clamp. Stow away the excess length at the power
supply unit.
Polarity of the connection cable: Red='+', white='-'.
Protect the cable from falling out using foam padding.
toa
Install the cable of closing sequence control.
The pane and groove must be properly aligned. Ensure
that the wire cable is not pinched.
4
switch
control
unit.
for the installation,
com-
IP20; only for dry rooms
-5 oc to 50 oc
NYM-O, 2 x 1.5 mm2
NYM-J, 3 x 1.5 mrn2
protective conductor insulated
230 v AC
24 V DC ±
260 mA
as work
instructions
as well as the
Loosen the screws slightly. The buffer stop rod under
the driver
must
not tilt.
The middle cover panel that may be cut to size "A" to
size "C" is to be shorten. While doing so, the smoke
switch opening must be under the measurement cham-
ber of the smoke
switch.
CAUTION!
If the cover panels clip, do not squeeze the cable. Set the
protective cap in such a way that the smoke switch opening
is concealed in the cover panel in order to protect the inner
space of the system from contamination before commissi-
oning.

Initial operation

CAUTION!
The installation of the smoke switch may only take place
shortly before commissioninq.
danger of contaminating the smoke switch with construc-
tion dust. This can considerably shorten the life span of the
smoke
switch.
The retention force can be adjusted as required. According
to EN 1155,the extension torque for a door with 900 hold-
open should be 40 Nm-120 Nm.
CAUTION!
Check
the freedom
of movement
Initial switch-on, test
Remove the protective cap (if not already done).
Turn power on. Status display turns GREEN and current
flows through the electromechanical hold-open device.
Engage the door leaf in the electromechanical hold-
open device.
Press the reset
button
The status display turns YELLOWfor approximately 4
seconds.
The door closes.
The status display then again turns GREEN.
Functional
test
Functional test of electromechanical
and closing sequence control:
Open active leaf and engage in electromechanical hold-
open device.
Open fixed leaf and engage in electromechanical hold-
open device.
Pushactive leaf out of the electromechanical hold-open
device. The fixed leaf closes automatically. Active leaf
remains in the waiting position of closing sequence
control
and also closes
Acceptance test
An acceptance test must be carried out in order to ascertain
the correct function and installation according to the regulati-
on, once the installation has been completed. For this, follow
the document
"Instructions
ning, operation and after-sales service maintenance Of GEZE
hold-open system FAGC".
Maintenance, care, repair
Regular servicing has to be carried out. For more informa-
tion on this, please observe the document "Instructions for
Installation, Commissioning, Operation and Maintenance of
the GEZEHold-Open Device FA GC".
GEZE TS 5000
R-ISM
If installed early, there is a
of the rocker
switch.
on the smoke
switch.
hold-open device
when
fixed
leaf is closed.
for the installation,
commissio-

Quicklinks ausblenden:

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ts 5000 r-ism/gTs 5000 r-ism/sTs 5000 r-ism/0

Inhaltsverzeichnis