ENI English
Product description
TS 5000 R:The system contains an electrical hold-open
device
for the door
leaf.
TS5000 Rwithout integrated hold-open device:The system
does not havean integrated electrical hold-open device. The
system hasbeen equipped with a hold-open device using a
hold-open magnet.
TS5000 RFS: The system hasan electrically actuated free-swing
device in the closer.
The systemsare controlled by an integrated smoke switch con-
trol unit and are approved for installation on single leaf fire and
smoke protection doors. The system is triggered if there isa fire
or a power failure, and the door closesautomatically
Further documents
The components supplied by GEZEinclude further do-
cuments describing the installation or connection of the
system. These must be read and followed.
a
Door closer
insta llation
Door closer
user information
o Instructions for installation, commissioning, operation
and after-sales service maintenance
at www.geze.com).
Safety notices
Follow the document
"Instructions
missioning, operation and after-sales service maintenance
of GEZEhold-open system FAGC" for electrical connection
and commissioning (available at www.geze.com).
DANGER!
Danger of electric shock!
Electric wiring must only be carried out by professional
electricians.
Interrupt power supply! Secure against reactivation.
A 16 A circuit breaker must be provided on site (suitable
for the electrical installations).
Use cable protection for the 230 V cable when leading-
through plaster.
Insert the cable protruding from the wall through theres-
pective openings of the smoke switch housing only.
Technical data
Protection rating
IP rating
Ambient temperature
230 V supply cable
Supply voltage:
Operating voltage:
maximum
current
con-
sumption
Installation
details
The remarks
are intended
associated graphical installation instructions.
ton
Drill fixing holes for door closer, guide rail, smoke
switch housing (A), power supply 230V (B) and optio-
nally additional connections (C).
toa
DANGER!
Follow safety precautions
toa
Lay down the power supply line 230 V starting from the
clamp. Stow away the excess length at the powersupply
unit.
4
instructions
of FA GC (available
for the installation,
com-
IP20; only for dry rooms
-5 oc bis 50 oc
NYM-O, 2 x
mm2
NYMJ, 3 x
mm2
protective conductor insulated
230 V
-15%,
24 V DC ±
260 mA
as work
instructions
as well as the
Protect the cable from falling out using foam padding.
Fit the protective cap so that the smoke switch opening
is concealed in the cover panel in order to protect the
interior of the system from contamination.
The protective cap must be removed when the hold-open
system is commissioned.
CAUTION!
When clipping on the cover panels do not squeeze the cables.
Fit the protective cap so that the smoke switch opening is
concealed in the cover panel in order to protect the interior of
the system from contamination before commissioning.
Initial operation
CAUTION!
The installation of the smoke switch may only take place
shortly before commissioning. If installed early, there is a
danger of contaminating the smoke switch with construc-
tion dust. This can considerably shorten the life span of the
smoke
switch.
The retention force can be adjusted as required. According
toe
to EN 1155,the extension torque for a door with 900
holdopen should be 40 Nm—120 Nm.
CAUTION!
Check
the freedom
of movement
The protective cap must be removed when the hold-
open system is commissioned.
Initial switch-on, test
Remove the protective cap (if not already done).
Switch on the current (in case of TS 5000 RFS,additio-
nally via the lateral push button on the door closer).
Status display light is GREENindicating that current is
being supplied to the electrical hold-open device (TS
5000 R)or free-swing door closer (TS5000 RES).
Engage the door leaf in the electrical hold-open device
(TS 5000 R)or open the door through >900against the
closing force (TS 5000 RFS,freeswing activated).
Press the reset button
The status display turns YELLOWfor approximately 4
seconds. The door closes. The status display then again
turns
GREEN.
Acceptance test
An acceptance test must be carried out in order to ascer-
tainthe correct function and installation according to the
regulation, once the installation has been completed. For
this, follow the document "Instructions for the installation,
commissioning, operation and after-sales service mainte-
nance of GEZEhold-open system FAGC".
Maintenance, care, repair
Regular servicing has to be carried out. For more informa-
tion on this, please observe the document "Instructions for
Installation, Commissioning, Operation and Maintenance of
the GEZEHold-Open Device FA GC".
GEZE TS 5000
R/ TS 5000 RFS
of the rocker
switch.
on the smoke
switch.