Herunterladen Diese Seite drucken

Bosch Air Room Control ARC C-2 Kurzanleitung Seite 9

Vorschau ausblenden Andere Handbücher für Air Room Control ARC C-2:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 7
1
[en] General safety instructions
H Notices for the target group
These installation instructions are intended for qualified
persons who are skilled in dealing with climate, heating and
electrical systems. All instructions must be observed. Failure to
comply with instructions may result in material damage and
personal injury, including danger to life.
▶ Read installation manual (outdoor unit, indoor unit, control
unit, ERV ventilation unit, etc.) prior to installation.
▶ Observe the safety instructions and warnings.
▶ Follow national and regional regulations, technical
regulations and guidelines.
H Intended use
▶ Only use the product to control units for Air Flux VRF air
conditioning systems (VRF = Variable Refrigerant Flow).
All other use is considered unsuitable. Any damage resulting
from prohibited operations is excluded from liability.
H Electrical work
Electrical work must only be carried out by a qualified
electrician.
▶ Before starting electrical work:
– Isolate the mains electrical supply and secure against
reconnection.
– Using suitable means, test that the mains voltage is
disconnected.
▶ Never connect the product to mains voltage.
▶ Also observe the connection diagrams of other system
components.
Air Room Control – 6721853307 (2023/10)
2
Data Protection Notice
We, Bosch Thermotechnology Ltd.,
Cotswold Way, Warndon, Worcester WR4
9SW, United Kingdom process product and
installation information, technical and
connection data, communication data,
product registration and client history data to provide product
functionality (art. 6 (1) sentence 1 (b) GDPR / UK GDPR), to
fulfil our duty of product surveillance and for product safety
and security reasons (art. 6 (1) sentence 1 (f) GDPR / UK
GDPR), to safeguard our rights in connection with warranty and
product registration questions (art. 6 (1) sentence 1 (f) GDPR
/ UK GDPR) and to analyze the distribution of our products and
to provide individualized information and offers related to the
product (art. 6 (1) sentence 1 (f) GDPR / UK GDPR). To provide
services such as sales and marketing services, contract
management, payment handling, programming, data hosting
and hotline services we can commission and transfer data to
external service providers and/or Bosch affiliated enterprises.
In some cases, but only if appropriate data protection is
ensured, personal data might be transferred to recipients
located outside of the European Economic Area and the United
Kingdom. Further information are provided on request. You
can contact our Data Protection Officer under: Data Protection
Officer, Information Security and Privacy (C/ISP), Robert
Bosch GmbH, Postfach 30 02 20, 70442 Stuttgart,
GERMANY.
You have the right to object, on grounds relating to your
particular situation or where personal data are processed for
direct marketing purposes, at any time to processing of your
personal data which is based on art. 6 (1) sentence 1 (f) GDPR
/ UK GDPR. To exercise your rights, please contact us via
privacy.ttgb@bosch.com To find further information, please
follow the QR-Code.
[en] General safety instructions
9

Werbung

loading

Diese Anleitung auch für:

Air room control arc h-2