Herunterladen Diese Seite drucken

Husqvarna PG 400 Bedienungsanweisung Seite 12

Vorschau ausblenden Andere Handbücher für PG 400:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

9. Select the applicable position for the operation and
tighten the lock knob. The bottom hole increases the
grinding pressure and the height of the handlebar.
The top hole decreases the grinding pressure and
the handlebar.
Grinding pressure
Refer to the tables for the grinding pressure with each
height and counterweight.
Grinding pressure: 3-phase
Counter
Handle po-
weight
sition, low
kg/lbs
1
49/108
2
43/95
3
38/84
Grinding pressure: 1-phase
Counter
Handle po-
weight
sition, low
kg/lbs
1
50/110
2
44/97
3
39/86
To adjust the grinding pressure
Add or remove weight plates to adjust the grinding
pressure that is necessary for the surface.
12
Handle po-
Handle po-
sition, cen-
sition, top
ter kg/lbs
kg/lbs
51/112
53/117
46/101
49/108
41/90
45/99
Handle po-
Handle po-
sition, cen-
sition, top
ter kg/lbs
kg/lbs
52/115
54/119
47/104
49/108
43/95
46/101
1. Push the handle on the central hinge and at the
same time fold the top frame forward. This is the lift
position.
2. Remove the 4 screws that hold the weight plates.
Add or remove 1 or 2 plates to get the necessary
grinding pressure.
Diamond tools
There are many types of diamond tools for the product.
Speak to your approved service center or go to
www.husqvarnacp.com to select correct diamond tool.
Metal bond diamond segments
Note:
Husqvarna recommends to use 2 segment
setup.
The setup of the diamond segments on the grinder will
have an influence on the performance. The setup have
an effect on the work rate of the product and the end
quality of the surface.
There are a number of different diamond tool
configurations that can be attached to the product.
2258 - 001 - 19.10.2023

Werbung

loading