Herunterladen Diese Seite drucken

Motorola solutions IMPRES 2 Benutzerhandbuch Seite 15

Adaptives ladegerät
Vorschau ausblenden Andere Handbücher für IMPRES 2:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 166
Status
Fault
Standby
End of Service Life
3.2
IMPRES 2 or IMPRES Battery Initialization
A new IMPRES battery or IMPRES 2 battery must be initialized by the charger for full IMPRES
functionality.
The charger automatically detects the new IMPRES or IMPRES 2 battery, and automatically
starts Initialization. Battery initialization includes calibration or reconditioning for battery without self
calibration icon.This is a two-phase process. The first phase is battery discharge, indicated by the
status LED in steady amber. The second phase is full charge, indicated by steady green LED. This
process may take up to 12 hours or more to complete, depending on the state of charge and capacity
of the battery. Interruption of either phase delays the battery initialization until the next charging
opportunity.
3.3
Calibration Switch
The charger is equipped with a switch on the bottom of the unit that can be used to manually terminate
the calibration process (as a systemic, on going use case). The charger continues to provide an
indication that the battery needs to be calibrated.
To enable the calibration feature, push the switch located at the bottom of the charger to ON.
LED Indicator
Blinking Red
Blinking Amber
Alternating Red/Green
MN004263A01-AL
Chapter 3 : Charging Procedure
Description
Refer to Troubleshooting.
Battery is waiting to rapid
charge. Battery may be too
hot, too cold, or low voltage
Battery continues to be usable
but may be nearing the end of
its rated service life
15

Werbung

loading

Diese Anleitung auch für:

Pmpn4350Pmpn4444Pmpn4500