Volume increase in the cooling system
A UKV 200-300/Kyla is installed as a volume increaser in those cases where the system volume in the climate
system is below the minimum recommended volume for the heat pump.
Volume and flow equaliser in the cooling system
A UKV 200-300/Kyla is installed as a volume and flow increaser in those cases where the system volume in the
climate system is below the minimum recommended volume for the heat pump and/or the flow is restricted
without control.
PIPE INSTALLATION
Pipe installation must be carried out in accordance with
current norms and directives.
The system where UKV 200-300/Kyla is installed must
be supplied with a safety valve of max. 6 bar (0,6 MPa).
The overflow pipe must be the same size as the safety
valve's. Route the overflow pipe from the safety valve,
sloping along its entire length, and ensure that it is frost-
proof and well supported. The mouth of the overflow
pipe must be visible and not placed close to electrical
components.
Ensure that incoming water is clean.
If uncertain, contact a plumber alternatively see applic-
able standards.
Caution
Fit the cover discs before the pipe installation
is made
UKV 200-300/Kyla | GB
All manuals and user guides at all-guides.com
FILLING
Fill the accumulator tank as follows:
1.
2.
3.
Open the vent valve (QM23) at the top of the accu-
mulator tank.
Fill the vessel through the drain valve.
When only water comes out of the vent valve (ini-
tially an air-water mixture comes out of the valve),
the vent valve can be closed the accumulator tank
is filled.