Herunterladen Diese Seite drucken

ABB 6136/100C-102-500 Bedienungsanleitung Seite 85

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

ENG
3. Highlight the project in the project list and
press the "OK" button
4. The project is transferred from the
SD/MMC card into the room/control panel
and starts automatically.
5. The units exits the programming mode
automatically and the basic view is
displayed.
Programm-
1. Create the new project on a PC.
ing using
2. Connect the computer with the bus via an
the bus
RS 232 or a USB interface.
3: Press the "KNX Programming Mode" button
and enable it.
4. Start programming from the PC.
This process may take several hours.
44
KNX
KNX
Fig. 68
Fig. 69

Werbung

loading

Diese Anleitung auch für:

Cpc/u 3.1