STIEBEL ELTRON ETS 200 Montageanweisung Seite 10

Vorschau ausblenden Andere Handbücher für ETS 200:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
⇒ Push the pendulum plate (24) onto the
heating element.
Fix the heating element into the locking
clips, and insert the pendulum plate into
the slots on the left­hand side of the air­
flow device and joggle from behind.
The base of the thermostat must lie
flat.
⇒ Wire the heater and thermostat (N2) by
means of the cable harness (26) provided.
Plug the end of the cable harness with 2
flat plugs onto the thermostat, plug the
other 2 flat plugs of the cable harness onto
the heating element connections and fix
the cable harness into the clip(s) on the
underside of the airflow device (like the
cables of the thermostat already installed in
the appliance).
Push the free end of the cable harness
through the front opening at the bottom
of the side wall.
⇒ Fit the air flap(s) back into the air flow
device, slide the air flow into the device
(when doing this, gently pull the cable
harness into the switch chamber with the
silicon sleeve) and screw it in place.
Connection of supplementary heater with existing wall­mounted room thermostat ...
. . . RTA­S/RTP­S/RTU­S
R1
R1
100%
100%
X17
X17
X16
X16
I I
I I
I
I
I I
I I
I
I
I
I
V
V
V4
V4
A1
A1
X12
X12
X11
X11
X13
X13
R1
R1
B1
B1
3
2
LH LH` LE
TA
TA
+ -
+ -
LE`
LE`
X3
X3
4
DC
DC
Aufladesteuerung
Aufladesteuerung
Kleinspannungs-System
Kleinspannungs-System
10
⇒ Suspend the angle plate back onto the
partition wall.
⇒ Connect the free end of the cable harness
as shown in the following table (see circuit
diagram also), and fix the cable harness to the
rear face of the angle plate (cable holder).
Designation
Lead (end sleeve) Cable harness LH (X2)
Lead (flat plug)
⇒ Connect switch and thermostat (N3) as
shown in the table below. The wiring ar-
rangement depends on the type of ther-
mostat concerned (see circuit diagram).
RTA­S/RTP­S/RTU­S or RTI­E3
Designation
Lead 2
Lead 3
Lead
(end sleeve­flat plug)
Copper bridge
2 3
5
5
A4
A4
N4
N4
S1
N6
N6
K1
K1
X14 - X15
X14 - X15
4
4
N
N
3
3
1
1
2
2
X2
L-
L-
N
A1
A1
A2
A2
L
L
N
N
N
N
N
N
N
N
L
L
SH
SH
Z1
Z1
Z2
Z2
AC
AC
Aufladesteuerung
Aufladesteuerung
230 V-System
230 V-System
1/N/PE ~ 230V
1/N/PE ~ 230V
RTA-S
RTA-S
RTP-S
RTP-S
RTU-S
RTU-S
Laying
from
to
Cable harness N3
Laying
from
to
S1 (top)
LH' (X2)
S1 (bottom) LH (X2)
N3
N (X2)
LE (X2)
LH' (X2)
. . . RTNZ­S/RTPZ­S
E5
E5
4
E
8
E3
E3
N2
E1
E1
N3
M3
M3
X17
X17
I I
I I
I
I
I I
I I
I
I
I
I
V
V
L3
L3
L2
L2
M2
M2
X13
X13
L3
L3
L2
L2
M1
M1
F2
F2
N5
N5
LE
LE
N
N
3
3
2
2
1
1
L3
L3
L2
L2
L1
L1
+ -
+ -
X3
X3
3/N/PE
3/N/PE
400 V
400 V
DC
DC
Aufladesteuerung
Aufladesteuerung
Kleinspannungs-System
Kleinspannungs-System
RTNZ-S
RTNZ-S
RTPZ-S
RTPZ-S
RTI-EP2
Designation
Lead 2
Lead (double plug) S1 (bottom) S2 (bottom)
Lead
(end sleeve - at plug)
RTNZ -S/RTPZ-S
Designation
Lead
(end sleeve­flat plug)
⇒ Incorporate the switch leads from the
switch into the cable harness (use driller).
⇒ Pivot the angle plate backwards and screw
it tight.
⇒ Resecure the side wall, front wall, and air
outlet and inlet grilles to the device (pay
attention to the installation sequence).
Tighten the securing screws for the
side wall and front wall with toothed
disk (protective earth lead connection).
E6
E6
vi
vi
E4
E4
A4
A4
R1
R1
E2
E2
ws
ws
br
br
100%
100%
X16
X16
V4
V4
L1
L1
X14 - X15
X14 - X15
A1
A1
X11
X11
X12
X12
L1
L1
F1
F1
R1
R1
K1
K1
B1
B1
X1
X1
X2
L-
L-
LH
N
TA
TA
LE`
LE`
LH` LE
LH` LE
N
N
N
N
N
N
N
N
L
L
SH
SH
4
Laying
from
to
S1 (top)
LH (X2)
N3
N (X2)
Laying
from
to
N3
N (X2)
E5
E5
4
E
8
E3
E3
N2
5
5
N4
N4
E1
E1
N3
N6
N6
M3
M3
K1
K1
M2
M2
M1
M1
F2
F2
N5
N5
4
4
N
N
3
3
1
1
2
2
L
L
LE
LE
3
3
2
2
A1
A1
A2
A2
N
N
Z1
Z1
Z2
Z2
AC
AC
Aufladesteuerung
Aufladesteuerung
230 V-System
230 V-System
1/N/PE ~ 230V
1/N/PE ~ 230V
L3
L3
L3
L3
1
1
L3
L3
3/N/PE
3/N/PE

Werbung

loading