2.5 INSTALLATION SPACE
The following scheme indicates the space necessary for the installation.
2.6 INSTALLATION PROCEDURE
Perform the following procedure:
1 Remove the rubber supports
2 Unscrew the 4 screws from the top cover and remove it
3 Attach the box to the rear vertical board from the inside with
M4 screws (not provided) and place 3 mm washers on the
outside to separate the box from the wall.
4 Reinstall the top cover. Be careful to position it correctly.
5 Keep free grated area for ventilation and cable connection.
C A U T I O N
Before applying power and turning on CHL-MBS-01 you must
ensure that:
• All circuits to be connected are correctly applied.
• All H-Link connections have been set up.
• Follow the local regulations for the electrical installation of
CHL-MBS-01 and associated circuits.
Any unit that is not connected or is not under power when tur-
ning on CHL-MBS-01, will not be recognised and will have to be
configured later.
10
PMML0301A rev.0 - 09/2013
C A U T I O N
• The signals' cables should be as short as possible. Keep a
distance of more than 150 mm from other power cables. Don't
wire them together (although they may intersect). If they must
necessarily be installed together, take the following measures
to avoid noise:
• Protect the signal cable with a metal tube which is earthed
at one end.
• For communications, use shielded wire which is earthed
at one end.
D A N G E R
• Always disconnect the power supply for CHL-MBS-01 when
handling the machine, in order to avoid eletrical discharges.
• Do not connect the interface to the power supply until the ins-
tallation has been completed.
• Comply strictly with local security codes and regulations when
connecting the machine to the electric network.
• You will need a three-wire cable (two cores and earth) with a