Herunterladen Diese Seite drucken

RHÉA-FLAM LUCERIA C 02 Installationsanleitung Seite 21

Vorschau ausblenden Andere Handbücher für LUCERIA C 02:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN
Distances from ammable materials
Back (d
)
R
Front (d
)
P
Front to the oor (d
)
F
Side (d
)
S
Side with glass (d
)
S1
Side – niche (d
)
S
Side – location 45° (d
)
S3
Side radiation (d
)
L
From the oor (d
)
B
From the ceiling (d
)
C
Distances from nonammable materials
Back (d
)
R
Side (d
)
S
Notice
If the products are installed in areas where air is suctioned by fans hoods heating or ventilation equipment external air
intake (AI) must be ensured. Turn off all ventilation devices in the house before the planned stoking.
The product must be installed on oors with adequate load bearing capacity.
Adequate access for cleaning and maintenance of your product ue and chimney must be provided during installation
unless the product can be cleaned from another location such as the roof or a dedicated door.
The product and its ue gas paths must be regularly and thoroughly rechecked and cleaned before and after the heating
season.
Read the general instructions carefully.
R H E A F L A M
I n s t a l l a t i o n i n s t r u c t i o n s
21 | 29
21/29
LUCERIA C 02
0
1000
---
---
800
---
---
---
---
600
0
---
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

Werbung

loading