Herunterladen Diese Seite drucken

RHÉA-FLAM LUCERIA C 02 Installationsanleitung Seite 19

Vorschau ausblenden Andere Handbücher für LUCERIA C 02:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN
Add 3. Heating and reloading
First open the ap (Fig. 3 position -) before tting. Set the air supply control to the open position. Follow the chapter in
this document: Product operation – 3. Heating and reloading. Close the rebox door after adding. Wait for ames to
appear in the rebox. Close the re damper (Fig. 19 position +). It is recommended to set the air control to the optimum
position at the rated output. o not add fuel until the wood has burned down to embers.
Fig. Heating and reloading 1–7
Add 4. Termination of heating process
Close the air control and re damper when the rebox burns out (Fig. 19 position +). Closing the air control and damper
will prevent unwanted escape of accumulated heat into the chimney.
R H E A F L A M
I n s t a l l a t i o n i n s t r u c t i o n s
19 | 29
19/29
LUCERIA C 02

Werbung

loading