Herunterladen Diese Seite drucken

Iberital IB7 Betriebsanleitung Seite 66

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

IBERITAL
Press (on any button pad of any group) the 'non-stop' button, and the '2 espressos' button at the same time; the
LEDs for '1 coffee' and '2 espressos' will light up.
LCD display screen (non-touchscreen):
Once the combination of buttons has been pressed on any control panel, the display will show:
At the end of the cleaning cycle the machine will return to the start MENU.
The cleaning cycle procedure can be carried out on all groups at the same time.
TFT display screen (touchscreen):
In addition, we can perform this function by initiating the auto-wash function from the user menu (section
2.9.3.2.1). The system will keep us informed regarding the status of the process. Once completed, it will notify us
via a message, and we will have to confirm it in order to quit the option.
2.6.3. Cleaning the machine exterior
The machine's exterior panels should be cleaned with hot, soapy water (not boiling) and completely rinsed using a
soft cloth or sponge. Do not use abrasive products, as the panels could be scratched.
2.7.- CHANGING THE BOILER WATER
Disconnect the machine by setting the three-position switch (12) to the off position.
Open the steam knobs (7) until no more steam comes out. (Use the steam dispensers (9) with care, as
during normal operations they are extremely hot).
Close the steam knobs (7).
Open the drain valve (25) until the boiler is completely empty.
Close the drain valve (25).
Connect the machine, setting the switch (12) to position 1 (or switch (22) to ON) and wait until the
automatic control system completes the filling of the boiler from the mains water supply.
2.8.- WATER SOFTENING (NOT INCLUDED)
The water softener removes lime from the water supply, preventing the formation of deposits and scale. The water
softener deteriorates with continuous use, and must be cleaned periodically or replaced. This process must return
the softener to its original condition. The presence of lime scale in the boiler due to an oversight of this process
will render any manufacturer's guarantee void. (The water softener is not included.)
Page 66
All manuals and user guides at all-guides.com
Rinsing
INSTALLATION AND OPERATION MANUAL

Werbung

loading

Diese Anleitung auch für:

IntenzNewExpression pro