Herunterladen Diese Seite drucken

RHÉA-FLAM LAMYDH 20 Installationsanleitung Seite 13

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN
1
preparation of fuel for heating
placements of wood in the chamber
2
3
igniting the wood from above
4
stoking
A
closed
B
open – heating at nominal output (optimal operation)
C
open – starting a re position (putting the product into operation)
A
closed
open – heating at nominal output (optimal operation)
B1
B2
open – primary air closed
C
open – starting a re position (putting the product into operation)
R H E A F L A M
I n s t a l l a t i o n i n s t r u c t i o n s
13 | 22
13/22
LAMIA H 20

Werbung

loading

Diese Anleitung auch für:

Lamia h 20