All local regulations, including those referring to national and European standards, must be observed
when installing the product. Assembly and installation of your chosen product must be performed only
by an authorized dealer of RHEA FLAM company. This is necessary for the recognition of the warranty
and the proper functioning of the product. This product is not suitable as a primary heat source.
Instruction manual
Please read the information and
instructions in the Instruction
manual carefully.
Operation of the product
1
Hardening of the paint
The rst heating of the product should take
place with a limited amount of smaller pieces of
wood (ca ½ the average fuel). Leave the door
ajar (approximately  cm gap) so that the door
cord does not stick to the paint. Also open the air
supply to the maximum (Fig. C). Slow process of
heating up will prevent paint damage and
deformation of materials. After burning the
wood on glowing coals you can proceed to
hardening of the paint. Place the allowed fuel
dose in the chamber using smaller logs and
pieces. Leave the door ajar (approximately  cm).
The paint under the door must harden
sufciently. When this dose burns out carry out
at least  to 3 additional periods with the allowed
fuel dose now with the door closed and the air
supply open to the maximum (Fig. C).
Hardening of the paint is accompanied by an
odor that persists throughout full hardening
process so described actions should only be
carried out with sufcient room ventilation.
2
Heating up
Move the air supply lever to the open position
(Fig. C) if there is no automatic combustion
regulation active. If the product includes a cast
iron grate open it. Use twice amount of the
avarage fuel dose for ignition. First place larger
logs on the bottom of the chamber then layer
ner logs of dry piece of wood on them (Fig. )
Operating chimney draft
Operating draft is 1 Pa.
Maximum operating chimney
draft is 0 Pa. This should be
measured during full operation
of the product. It is recommend-
ed to install a draft regulator
especially when the appliance is
equipped with unit for automa-
tic combustion regulation.
3
4
R H E A F L A M
I n s t a l l a t i o n i n s t r u c t i o n s
12 | 22
12/22
Authorized fuel
Dry lump wood with residual
moisture up to 0 %. The stated
average fuel consumption must
always be observed – 175 kg/h.
The recommended fuel length is
approximately 00-330 mm.
Depends on the size of the
combustion chamber. Always
use at least  pieces of wood.
– igniting from above. Use a lighter that is
specically designed for this purpose. If nece-
ssary (the re still did not start after some time)
leave the door open for a while (approx.  cm)
for additional sufcient air supply. Then during
standard heating always keep the door closed.
Do not reload new dose of wood until the
previous batch has completely burned to
glowing coals and there are only embers in the
chamber without visible ames.
Heating and reloading
To equalize the pressure in the room and the
combustion chamber slightly open the door to
approx.  cm gap for 10 seconds before each
reloading. This will prevent possible escape of
ash and smoke into the room. Add the amount
of wood that is suitable for your product see
average fuel consumption (Fig. 4). After
reloading the wood always close the door
properly. We recommend setting the air supply
lever to the optimum position at nominal output
(Fig. B B1). Do not reload new dose until the
wood burns to glowing coals.
Termination of heating process
Once the wood in the chamber burns out move
the air supply lever to closed position. This will
prevent unwanted leakage of accumulated heat
into the chimney / outside (Fig. A).
LAMIA H 20

Werbung

loading

Diese Anleitung auch für:

Lamia h 20