Herunterladen Diese Seite drucken

Zodiac NOMAD RIB ALU 2.7 Eignerhandbuch Seite 22

Band 2 – teil 2

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 161
INFLATION
1./ Place all valves in inflation position.
2./ Fit the adaptor that matches the diameter of the "easy-push"
valve to the inflation tube tip.
3./ Attach the hose connector to the inflation pump inflation valve.
To properly inflate your tube, the inflator needs to be properly placed
on the ground.
The tube will inflate quickly if the inflator is operated smoothly and
unhurriedly.
4./ Inflate the tube starting with the first compartment (a) from the bow (front), until a pressure of 220 mb is
reached.
5./ Then inflate the aft compartments (c) to a pressure of 240 mb, still leaving the pressure gauge in the same
location. The partitions (1) enable the pressure between each chamber to balance out.
6./ Inflation is completed: screw on the inflation valve plugs.
b:240 mb
b:240 mb
NOTE: Observing a slight air loss before screwing the valve cap on is perfectly normal.
Only the plugs provide final airtightness.
WARNING
LIFTING MUST BE CARRIED OUT BY PROFESSIONALS.
Page 22 of 40
TUBE
1
1
614764

Werbung

loading