Herunterladen Diese Seite drucken

Compleo eBOX Kurzanleitung Seite 9

Werbung

Quickguide | eBOX - Modbus Energiemanagement
Maximum phase 2 current
Maximum phase 3 current
Fallback load adaption current for
phase 1
Fallback load adaption current for
phase 2
Fallback load adaption current for
phase 3
Timeout until fallback load
adaption is applied
Station phase setup for L1
Station phase setup for L2
Station phase setup for L3
Operative state of Box
4.2.
According to Modbus Register Specification there are essentially four (4) electrical current types at a node which
can either be read or set for each phase:
ActualMaxCurrentPhase1
ActualMaxCurrentPhase2
ActualMaxCurrentPhase3
CurrentPhase1
CurrentPhase2
CurrentPhase3
FallbackMaxCurrent1
FallbackMaxCurrent2
FallbackMaxCurrent3
MaxCurrentPhase1
MaxCurrentPhase2
9
MaxCurrentPhase2
RW
MaxCurrentPhase3
RW
FallbackMaxCurrent1
RW
FallbackMaxCurrent2
RW
FallbackMaxCurrent3
RW
RemainingTimeBeforeFallback
RW
StationPhaseSetupL1
RW
StationPhaseSetupL2
RW
StationPhaseSetupL3
RW
Availability
RW
1000
R
The maximum allowed electrical current of the node respectively the
electrical fuse protection of the node for phase 1
1002
R
The maximum allowed electrical current of the node respectively the
electrical fuse protection of the node for phase 2
1004
R
The maximum allowed electrical current of the node respectively the
electrical fuse protection of the node for phase 3
1006
R
The electrical current measured by the node on phase 1 (continuously)
1008
R
The electrical current measured by the node on phase 2 (continuously)
1010
R
The electrical current measured by the node on phase 3 (continuously)
1018
R/W
Fallback value for electrical current in case of loss of the TCP
connection for phase 1
1020
R/W
Fallback value for electrical current in case of loss of the TCP
connection for phase 2
1022
R/W
Fallback value for electrical current in case of loss of the TCP
connection for phase 3
1012
R/W
The maximum allowed electrical current of the node calculated and
distributed by load management system for phase 1
1014
R/W
The maximum allowed electrical current of the node calculated and
distributed by load management system for phase 2
1014
2
FLOAT32
[A]
1016
2
FLOAT32
[A]
1018
2
FLOAT32
[A]
1020
2
FLOAT32
[A]
1022
2
FLOAT32
[A]
1024
1
UNSIGNED16
[sec]
1025
1
UNSIGNED16
-
1026
1
UNSIGNED16
-
1027
1
UNSIGNED16
-
1028
1
UNSIGNED16
-
6 - 32
16
6 - 32
16
6 - 32
14
6 - 32
14
6 - 32
14
60 - 3600
60
1 - 3
2
0 - 3
3
0 - 3
1
-
1
MaxCurrentOfNode
MaxCurrentOfNode
MaxCurrentOfNode
MeasuredCurrentP1
MeasuredCurrentP2
MeasuredCurrentP3
FallbackCurrent
FallbackCurrent
FallbackCurrent
OperatingCurrent
OperatingCurrent

Werbung

loading