Herunterladen Diese Seite drucken

Swegon ESENSA Installationsanleitung Seite 4

Vorschau ausblenden Andere Handbücher für ESENSA:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

5. Option location
C1
G1
Picture 3
A. Duct connection (circular or rectangular)
B. Cable gland
C1/C2. Membrane entry grommet (control cable)
D. Main board
E. Slotted DIN rail (free space for other components)
G1/G2. Pressure sensors/stats
I1/I2. Membrane entry grommet (supply cable)
J1/J2. Holding tray (control cable)
K1/K2. Holding tray (supply cable)
L. Preheating coil location (electrical)
M. Postheating coil location (electrical/water)
Q. Hydraulics connection
R1/R2. Pressure tappings
4
www.swegon.com
A
I1
R1
L
J1
K1
B
D
MULTI.ESENSA.DEFROST.230821
Q
C2
E
R2
I2
M
J2
K2
RIGHT VERSION
We reserve the right to alter specifications.
G2

Werbung

loading