Herunterladen Diese Seite drucken

AC Schnitzer 1100 286 710 Montageanleitung Seite 27

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

F itt in g In st ru ct io ns
AC Schnitzer Performance Upgrade S63B44T2
Final Check and Test Drive
Refit all standard parts/covers previously removed, in the reverse order according to manufacturer's instructions.
Installation of the performance upgrade can create faults in the fault memory. After working on the electrical
system therefore always check for fault codes. Then carry out a test drive.
The AC Schnitzer performance upgrade only develops its full power when the engine has
reached optimum operating conditions. All fuels approved by the vehicle manufacturer may
still be used. For maximum performance, we recommend the use of minimum Super Plus fuel
RON 98.
WARNING!
Important Note!
When the AC Schnitzer performance upgrade is supplied preprogrammed, a certificate of conformity is included
in the scope of supply.
This document must be submitted to the local test centre, signed by the installing company, together with the
vehicle-specific component certificates.
By signature, you confirm proper installation in accordance with the Fitting Instructions.
Certificate
The component certificate required for entry in the vehicle documents is available for download from
our website!
http://www.ac-schnitzer.de/partner/
Warranty
The warranty conditions supplied (red envelope) must be given to the vehicle keeper on handover of the
vehicle.
The converted vehicle is automatically guaranteed by AC Schnitzer under the applicable warranty
conditions.
http://www.ac-schnitzer.de/bmw-automobile/service/garantie
Subject to errors, modifications and technical development!
* country-specific
AC Schnitzer - automobile Technik - Neuenhofstraße 160 - D - 52078 Aachen - Tel. 0241/5688 -130
Fitting Instructions No.: 1100 286 710 / Issue: 13.04.2016 / TSch / REV01
27
Fax -135

Werbung

loading