Herunterladen Inhalt Inhalt Diese Seite drucken

KERN ALJ-A02 Installationsanleitung Seite 15

Vorschau ausblenden Andere Handbücher für ALJ-A02:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5. Take the test liquid test tube (scope of delivery 5) and place it in the
corresponding holder as shown in figures 6 and 7.
Figure 7
6. Attach the other connecting ring (scope of delivery 7) above the liquid
reservoir (scope of delivery 6), as shown in figure 8 and place the glass lid
with cap (scope of delivery 8) facing upwards as shown in figure 9.
7. The evaporation protection trap is now fully assembled.
8. At this point the draught shield of the balance can be closed.
To start calibrating a pipette, the upper draught shield glass must be opened,
and the liquid pumped into the test tube according to the various steps of the
selected control procedure.
TALJ-A02-IA-def-2210
Figure 8
Figure 9
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis