Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly Of The Evaporation Trap - KERN ALJ-A02 Installationsanleitung

Vorschau ausblenden Andere Handbücher für ALJ-A02:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3 Assembly of the evaporation trap

Assembly example ALJ 210-5A)
1. Open the draft shield (right or left side) of the balance. For a 0.01mg balance:
Remove the draft shield ring.
2. Take the disc with the test tube holder (scope of delivery 1) and place it on the
weighing pan as shown in figure 1, making sure that the three cylindrical
supports under the disc fit into the free areas of the weighing pan.
3. Take the base of the evaporation trap (scope of delivery 2) and place it on the
balance as shown in figure 2, centring it on the aluminium disc below. Make
sure that the test tube holder is centred in the hole of the base without
damaging it.
Figure 1
4. One after the other, attach the lower glass (scope of delivery 3), the
connecting ring (scope of delivery 4) and above it the liquid container (scope
of delivery 6), as shown in figures 3, 4 and 5.
Figure 4
4
Figure 2
Figure 5
TALJ-A02-IA-def-2210
Figure 3
Figure 6

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis