Herunterladen Inhalt Inhalt Diese Seite drucken

GF SPC Betriebsanleitung Seite 17

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operating Instructions
4.1.2
Procedure
1.
Prepare the valve with actuator (1) for assembly of the type SPC positioner, observing the operating instructions for the actuator
and valve (1).
2.
Screw the stem adapter (2) into the actuator of the valve (1) (torque 2.5 Nm).
3.
Screw the shift spindle (3) into the stem adapter (2).
4.
Screw the thread adapter (4) together with the bushing (5) and the shaft sealing ring (6) into the guide element (7).
5.
Insert guide element (7) with O-ring (8) into shift spindle (3).
6.
Position the molded seal (10) on the adapter slide (9).
7.
Mount adapter washer (9) to guide element (7).
8.
Place the puck (11) on the shift spindle (3).
12
11
11
10
9
8
7
6
5
4
3
2
1
No.
Designation
1
Actuator with valve
2
Spindle adapter
3
Shift spindle
4
Thread adapter
5
Bushing
6
Shaft seal ring
7
Guide element
8
O-ring
9
Adapter washer
10
Molded seal
11
Puck
Adapter assembled
No.
Designation
11
Puck
12
Guide rail
Type SPC positioner
17

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis