Herunterladen Inhalt Inhalt Diese Seite drucken

Putting The Appliance Into Operation - Geberit AQUACLEAN 4000 Montageanleitung

Vorschau ausblenden Andere Handbücher für AQUACLEAN 4000:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
EN
Commissioning
Putting the appliance into
operation
Prerequisite
– The function test was performed successfully.
– The appliance is installed correctly.
1
Remove the spray shield.
2
Clean the appliance.
Result
✓ The appliance is ready for operation and can be
handed over to the customer.
16
Handing over the appliance
1
User manual
2
Spray shield
1
Instruct the customer with regard to
operation and cleaning, as per the user
manual.
2
Hand over end user documentation to the
customer.
3
Fill in the warranty card together with the
customer and send it to Geberit.
4
Refer the customer to the warranty
extension during registration. For
information on registration options, see user
manual.
9007210975787019 © 05-2023
997.120.00.0(04)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis