Herunterladen Inhalt Inhalt Diese Seite drucken

Atlas Copco ETV STR61-25-10 Produktanweisungen Seite 7

Electric angle nutrunner
Vorschau ausblenden Andere Handbücher für ETV STR61-25-10:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 38
ETV STR61-25-10
5. Mount the following parts on the angle gear housing:
1.
new applicable front cap nut. Apply a thin layer of grease on the inside
of the cap nut.
2.
new sealing washer
lock ring
3.
6. Replace the O-ring on the motor housing with an O-ring with the same di-
ameter but thicker. Apply a thin layer of grease on the O-ring and on the
lower section of the motor housing.
7. Place the tool into the half-ring with two pins on the inside. When the half-
ring is placed in correct position, the pins will fit into the slots of the motor
housing and prevent the half-ring from turning.
8. Connect the flex cable to the bus port marked 1.
9. Connect the flex cable on the upper half-ring to the bus port marked 2 and
put together the two half-rings.
10. Place an O-ring in the slot at the front of the half-rings. Apply a thin layer
of grease on the O-ring.
11. Tighten the two half-rings with 4 screws using a screwdriver.
Make sure the sealing on the end of the half-rings seals tightly.
12. Pull out the planetary gear from the gear housing. Push down the planetary
gear fully on the shaft.
Make sure the gear wheel is placed in correct position.
Put the gear back in position. Apply a thin layer of grease on the sealing
washer.
13. Put the front part in the clamping jaw and fasten the clamping jaw in the
vise.
14. Tighten the front cap nut using adjustable spanners.
EN
© Atlas Copco Industrial Technique AB - 9836 742100 00
Installation
7

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

8436 6160 25

Inhaltsverzeichnis