Herunterladen Inhalt Inhalt Diese Seite drucken

weinor VertiTex II Montageanleitung Seite 35

Vorschau ausblenden Andere Handbücher für VertiTex II:
Inhaltsverzeichnis

Werbung

VertiTex II | 121872-0000 w | v3.2 | 2018-09-10 | Montageanleitung | Montagehandleiding | Instructions for assembly | Instructions d'installation
General
Intended use
VertiTex II is a sun protection awning that can only be used for this pur-
pose. Misuse can lead to hazards, damage or to collapse of the awning
and is not permitted. Changes, additions may only be carried out with
the written permission of weinor. Prohibited changes to the awning will
result in voiding of the guarantee claims.
CE mark
Weinor GmbH & Co. KG declares that
the VertiTex II is in compliance with
the basic requirements and relevant
provisions of the EN standards. The Ver-
tiTex II meets the requirements of the
wind resistance class indicated in the CE
conformity marks. The requirements shall
only be deemed to have been met once
the manufacturer's instructions have
been adhered to.
Qualifications
These instructions are addressed to trained fitters who should be qualifi-
cated and knowledable in installation techniques:
- Occupational safety at work, operating safety and accident prevention
regulations
- Handling of ladders, scaffolding, tools and machines,
- Transport of long, heavy components and glass panes,
- Judging of the building structures and fitting the fixing materials,
- Installation, start-up and operation of the product.
• Employ a professional installation company if you do not possess
these qualifications!
Safety symbols
Warning! Risk of electric shock
"Danger" of electric shock
Warning! Personal injury
"Danger" of personal injury
Caution! Product and property damage
Safety instructions
Warning! Danger of electric shock through incor-
rect electrical installations!
Follow the warning instructions for the prevention of electri-
cal shock!
• Electrical fixed installation may only be carried out by electrically
skilled person according to VDE 100!
• Observe the installation instructions for the electrical devices included
in the delivery!
• Separate the electrical connections from the mains during the installa-
tion!
• Only connect electrical terminals to mains system with all-pole discon-
necting device and with min. 3 mm contact opening width!
• Only connect the construction if indications on product relating to
voltage, frequency and output match those of the power source!
Careful! Personal injury can result from improper
installation and operation of the awning unit!
• Observe the instructions for installation and setting from the manu-
facturer of the drive and control!
• Keep packaging, sheeting and small parts away from children (cho-
king hazard)!
Technische Änderungen vorbehalten | Technische wijzigingen voorbehouden | We reserve the right to make technical changes | Sous réserve de modifications techniques
weinor GmbH & Co. KG
Mathias-Brüggen-Straße 110
50829 Köln
15
EN 13 561
Markise für die Verwendung
im Außenbereich
Windwiderstandsklasse:
Klasse 2
Danger level
III
Danger level
II
Danger level
I
• Before working at the awning, switch off the power supply, fuses and
the automatic control in order to prevent the risk of crushing or falling
due to uncontrolled movements of the system!
• Persons should never hold on to the awning. The drop profile and the
awning fabric are movable and may fold or give way!
Ladders:
• Do not lean ladders against the awning or fix them to the awning!
• Ladders must be on a firm base and provide adequate support!
• Only use ladders with adequate load-bearing capacity!
Anti-fall guards:
• Use appropriate anti-fall guards to prevent the danger of falling espe-
cially when working at considerable heights!
Mounting brackets:
• Check that the type and number of the mounting brackets supplied
are compliant with the order!
• Check that the information provided in the order about the installati-
on surface tallies with the actual installation surface on site! Installati-
on is inadmissible in case of safety-relevant deviations!
Fixing material:
• Use suitable installation and fitting materials (plugs, glue, etc.) corres-
ponding to onsite conditions and loads!
• Check that the awning is fitted with the type and number of brackets
recommended by the manufacturer!
• Check that the awning is installed using the dowel extraction forces
recommended by the manufacturer, and the manufacturer's guideli-
nes on dowels are observed when performing the installation work!
Crushing and shearing zones:
Crushing and shearing zones exist between movable components
and moving awnings parts (projection profile, housing, profiles) which
could catch and draw in clothing or body parts!
• Only activate awnings up to 2.5 m installation height or awnings
above accessible traffic routes if the moving parts are within your line
of vision! Electrical controls, radio controls with latch switches, stand-
alone latch switches, etc. are not permissible in this case!
• The key switch must be fitted in the line of vision of the projection
profile, but far enough removed from the movable parts, at a height
of 1.5 metres (national regulations relating to disabled people must
be observed)!
Test run:
• A visual inspection of the fixing material and brackets must be perfor-
med after the awning has been extended for the first time!
• When carrying out test runs, never use automatic system control or
switches if the awning is not in the operator's line of vision!
• Use test cable for the motor input!
Caution! Product and/or material damage through
improper transport!
• Secure cargo properly and safely!
• Protect the packaging from moisture (dampened packaging can
loosen during transport)!
• Seal open packaging for further transport!
• The awning must be carried to the place of installation the right way
round so it does not have to be turned round again in a confined
space!
Raise the awning to a higher level using ropes:
• Remove awning from the packaging and secure tightly with hauling
ropes!
• Lift the awning horizontally and evenly!
- Tool list → weinor Downloadcenter (DLC)
- Exploded drawing → weinor Downloadcenter (DLC)
7

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis