Herunterladen Inhalt Inhalt Diese Seite drucken

Water Connection; Air Connection - Imer Group KOINE 4 Handbuch Fur Bedienung, Wartung

Verputzmaschine
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 29

10.2 WATER CONNECTION

&RQQHFW WKH ZDWHU KRVH WDEOH  WR WKH ZDWHU PDLQV ¿J 
7KH ZDWHU PDLQV PXVW JXDUDQWHH D PLQLPXP ÀRZ UDWH RI
20l/min.
2WKHUZLVH D WDQN RI VXLWDEOH FDSDFLW\  O PXVW EH ¿WWHG ZLWK
clean water, to be kept full at all times, and from which water can
be taken by means of the self-priming pump supplied with the
machine. In this case the hose must have a minimum diameter
RI   D PD[LPXP OHQJWK RI P SUHIHUDEO\ D IRRW ¿OWHU DQG PXVW
not be subject to deformation during use.
 &DXWLRQ 7KH ¿UVW WLPH WKH ZDWHU SXPS
is connected to the tank, it must be activated by manually
¿OOLQJ WKH LQWDNH OLQH
The same operation must be repeated each time the circuit is
drained, or after a prolonged period of disuse.

10.4 AIR CONNECTION

&RQQHFW WKH DLU KRVH WR WKH PDFKLQH SDQHO DQG VSUD\ MHW ¿J
11. START-UP
&ORVH WKH DLU YDOYH UHID VXSSO\LQJ WKH VSUD\ MHW ¿J 
Open the micrometric valve (ref.8) virtually fully.
Turn the main switch/inverter (ref.1a) to position 1 or 2: in the
correct position the blue "phase correct" lamp illuminates (ref.1g).
Check that the water pressure gauge (ref.11) indicates a minimum
pressure of 3.5 bar and that the green "no water pressure" lamp
UHIL LV R  2WKHUZLVH DFWLYDWH WKH SXPS E\ PHDQV RI WKH ZDWHU
pump switch (ref.1f). Press the water supplement pushbutton
(ref.1d) for 3-4 seconds.
Start the pump by means of the start pushbutton (ref.1c):
the lamp on the start/stop pushbutton illuminates and the mortar
pump starts up for a few seconds.
Open the spray jet air valve: the machine starts up. Check that the
IMER INTERNATIONAL S.p.A.
KOINE 4/5
FIG.6
FIG.7
22
water pressure does not fall below 2.5 bar; otherwise activate the
ZDWHU SXPS 8VH WKH PLFURPHWULF YDOYH WR UHJXODWH WKH ZDWHU ÀRZ
UDWH GLVSOD\HG RQ WKH ÀRZ PHWHU UHI ZLWK UHVSHFW WR
- 800l/min if using gypsum based materials (pump D 6-3).
- 500l/min if using cement based materials (pump D 6-3).
Start the cell wheel by means of the relative switch (ref.1e) and
then stop it.
Close the air valve.
Fill the hopper with dry materials.
Open the air valve of the jet. Activate and deactivate the cell wheel
3 or 4 times by means of the relative switch
(2 -3 seconds operation, 2-3 seconds stopped) and then switch
on permanently. Regulate the water to obtain the consistency as
recommended by the material manufacturer. Close the air valve to
the spray gun. Check the material hoses to ensure perfect condi-
WLRQ WKDW FRXSOLQJV DUH LQWDFW DQG WKH UHODWLYH VHDOV DUH ¿WWHG DQG
SRXU DSSUR[  OLWUHV RI JURXW LQ WKH ¿UVW VHFWLRQ DQG WKHQ FRQQHFW
them to the delivery manifold (ref.10) and spray jet. Check that
the cam levers ( A ) of the couplings have been tightened correctly
and that the seal
% LV ¿WWHG DV VKRZQ LQ ¿J
FIG.8
FIG8
FIG.9
Start the machine: when the correct consistency of material is
delivered from the jet normal operation can be started.
The machine starts and stops by opening and closing the air
supply to the spray jet.
7KH PDFKLQH LV ¿WWHG ZLWK SURWHFWLRQ DJDLQVW SRZHU IDLOXUH DQG
water pressure failure: if one of these occur, press the start pu-
shbutton to resume operation.
To stop the machine in the event of an emergency, press the red
emergency pushbutton (ref.1b) to shut down the machine - all
moving parts are shut down - and then turn the main switch to 0
and remove the electric power plug from the socket (ref.1l).

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

11060031106004110600511063201106112

Inhaltsverzeichnis