Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 145

TRANSPORTING

If the generator has been running, allow the engine to cool for at least 15 minutes before loading the generator on the transport
vehicle. A hot engine and exhaust system can burn you and can ignite some materials.
Keep the generator level when transporting to reduce the possibility of fuel leakage. Move the fuel valve lever to the OFF
position.
When using ropes or tied owns traps to secure the generator for transportation, be sure to only use the frame bars as
attachment points. Do not fasten ropes or straps to any portions of the generator body.
65

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für CGM DUAL15000SP

Diese Anleitung auch für:

Dual20000sp

Inhaltsverzeichnis