Herunterladen Inhalt Inhalt Diese Seite drucken

Handling And Set-Up - Dantherm ACT-7 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für ACT-7:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Installation: Handling and set-up

Handling and set-up

Handling
Follow these instructions when handling the room unit:
Risk of plate deformation, damaging unit and human injuries
Warning
CAUTION
Caution
Risk of damaging the cooling circuit when laying down the room unit
Warning
CAUTION
Oil from the compressor can get inside
and damage the cooling circuit, if the
Caution
unit is laid down.
Avoid getting the water/glycol mixture on your skin and clothes
Precautions
The water/glycol mixture contains anticorrosive substances, which is noxious and can lead to
skin irritation. The substance can be difficult to remove from clothes.
Warning
CAUTION
Caution
Check always the fluid level of the ACT 7
Check the fluid
room unit before starting up the unit.
level
Look through the inspection window
(use a flashlight, if necessary) and check,
if the fluid level is between MIN and MAX
level. Top up the fluid, if the level is below
MIN.
Follow the steps below, if you need to fill up the fluid level.
step Action
1
2
3
Do NOT lift the room unit at
the handle
Use handle ONLY to push
and drag the room unit
Use a ramp to get the ACT 7
unit over a curb or alike.
Do NOT lay the room unit down
Always transport the room unit in
an upright position
Use gloves for connecting and disconnecting the interconnecting line.
If the glycol/water mixture is spilled on your skin, wash thoroughly with
water and soap.
Wear work clothes while connecting and disconnecting the ACT 7.
Ensure the ACT 7 is running in cool-
ing mode, before removing the filler
cap.
Loosen the screws and remove the
security plate of the filler cap.
Slowly remove the filler cap
Illustration
7

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis