Herunterladen Inhalt Inhalt Diese Seite drucken

Pin Assignment - Cosmo RRV EC-Serie Betriebs- Und Montageanleitung

Ec-rohrventilatoren
Vorschau ausblenden Andere Handbücher für RRV EC-Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

26
So that, according to DIN VDE
0664, release also for pulsa-
ting DC residual currents and
for smooth DC residual cur-
rents (universal current func-
tion).
So that while switching in the
charging current impulse
against earth is taking into
account
When you select the FI-Circuit
Breaker the entire leakage
current of all electrical fittings
shall be taken into account.

12 PIN ASSIGNMENT

Starting up according to the
circuit diagram 01.436:
Carry out the grid connection
(1~230V±10%).
Use to the speed setting ex-
ternal potentiometer
(10 kΩ) or 0-10 Volt external
signal.
If maximum speed is desired,
the connection 6 and 7
If after connection of the voltage
and the applying of a connection
bridge between the signal 6 and 7
there is no reaction of the speed,
the connection configuration
must be checked.
GRID CONNECTION
Suitable for the leakage
current of the motor. If
impulse-like fault currents
arises due to transient
(briefly) mains overvoltage
and unequal phase load
during starting operations, FI-
Circuit breaker in short-time
delayed execution (VSK) is
recommended. The switches
must be labeled with the two
shown symbol:
of the control wire can be
bridged.
A maximum of 10VDC volta-
ge can be connected to the
speedometer Output/ Open
collector.
If the operation is not possible
after connection configuration
please contact the COSMO GmbH.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis