Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting The Power Supply; Commissioning/Start-Up - Oase InScenio FM-Master Home Inbetriebnahme

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Connecting the power supply

Unit version with power plug:
• Push the coupling of the power cable onto the unit plug.
Unit version with power cable (version only for the United Kingdom):
• Only allow qualified electricians to perform work on the power supply.
• Adhere to the pin assignment specified on the power cable label. Note the warning on the
power cable.
• Only use wires with wire end ferrules.
Connect the power supply cable

Commissioning/start-up

Proceed as follows for start-up:
1. Install the "OASE Control" app on your smartphone/tablet. (→ Installing the "OASE Control"
app)
2. Connect the InScenio FM-Master to the power supply.
3. Activate the WLAN connection in the settings of your smartphone/tablet, start the app and
follow the instructions.
14
Fit the protection hood
FMR0005
FMR0008

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Inscenio fm-master cloud

Inhaltsverzeichnis