Assembly and operating instructions Type ALE3B5FM00
65 A bidirectional three-phase active power energy meter with M-Bus interface, Pic. 1
Description
Energy meter with M-Bus interface enables the reading of
all relevant data like meter reading, electricity, voltage and
power (active and reactive).

Technical data

■ Pic. 2
Connection
diagram
■ Pic. 3
Dimensions
■ B according to EN50470-3,
Accuracy class
1 according to IEC62053-21
■ I
Reference, Maxi-
ref
mum, initial current
■ 3 × 230/400 V
operating voltage
Tolerance −20%/+15%
■ 00 000,00...999 999,9 kWh
Counting range
■ 1000 Imp/kWh
LED-Ouptut
■ Conductor cross-section 1,5−16 mm
Connections
Main circuit
screwdriver pozi no. 1, slot no. 2,
torque 1,5−2 Nm
■ Conductor cross-section max. 2,5 mm
Connections
Control circuit
screwdriver pozi no. 0, slot no. 2,
torque 0,8 Nm
■ −25... +55°C (noncondensing
Operating
temperature
according standard EN50470)
■ Mechanical M2
Environment
Electromagnetic E2
Indicating elements (Pic. 4)
■ Shows total consumption Tariff
T
(kWh)
total
■ Shows partial consumption, this
T
(kWh)
part.
value is resettable
■ Shows total feeding back Tariff
T
(kWh)
total
■ Shows partial feeding back,
T
(kWh)
part.
this value is resettable
■ Shows the instantaneous power
P(kW)
per phase or all phases.
Current
Current
■ Shows the voltage per phase
U(V)
■ Shows the current per phase
I(A)
■ Shows the unit kWh when the
kWh
consumption is displayed
■ For P-, U-, I- or Error display, the
L1 / L2 / L3
corresponding phase is displayed
■ In case of missing phase, the
Error
corresponding phase is addition-
ally displayed.
Made in Romania
32303824-001 E
= 10 A, Im
= 65 A, Ist
40 mA
ax
=
, 50 Hz
AC
= consumption (pos.)
= feeding back (neg.)
2022-02-24
Notes before connecting
1. Do not connect L1, L2 or L3 to N
2. In order to avoid moisture in the meter due to conden-
sate build-up, acclimatise the meter at room temperature
for about half an hour before connecting.
3. N must always be connected.
Attention!
These devices must only be installed by a professional
electrician, otherwise there is the risk of fire or the risk of
an electric shock.

Installation instructions

The three-phase energy meter can be attached to a 35 mm
rail (EN60715TH35).
The meter can be used only in installation cabinets.
,
2
Method of operation (Pic. 5)
,
2
Energy is added as indicated by the arithmetic operator.
Positive output in the meter indicates that energy is being
supplied, while negative output indicates that energy is
being delivered.
Declaration of Conformity CE
We, Saia-Burgess Controls AG, CH 3280 Murten (Switzer-
land), herewith declare, on our own responsibility that
the products:
■ ALE3B5FM00C3A00
which this certificate refer to, are in accordance with the
directive 2014/32/EU (MID) and the following standards:
■ EN50470 parts 1 and 3 (electronic meter), of
October 2006.
■ Directive 2014/30/EG (EMC)
■ Directive 2014/35/EG (LVD)
Conformity Assessment Body:
METAS-Cert, Nr. 1259
CH-3003 Bern-Wabern
Givisiez, February 2022
Signed: Maarit White, EMEA Quality Leader - BMS
UK Importer Address:
Honeywell Building Technologies
Building 5 Carlton Park
King Edward Avenue
Narborough, Leicester LE19 3EQ
English
Subject to change without notice

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis