Herunterladen Inhalt Inhalt Diese Seite drucken

Eaton IF 1753 Installationsanleitung Seite 3

Champ led scheinwerfer
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

DIMENSIONS
VISOR INSTALLATION INSTRUCTIONS
1.
Remove power from floodlight.
2.
Place floodlight face up.
3.
Carefully align visor with four (4) screw holes at the top of the fixture
shown in Figure 8.
4.
Install screws provided with visor, taking care to not scratch the finish of
the floodlight. Torque to 19 in.-lbs. (2.2 N-m).
5.
Install floodlight per above instructions.
NOTE: Visor can be installed before or after floodlight has been in operation.
IF 1753 • 08/15
With Visor and Guard
Figure 6
With Visor Only
Figure 8
Copyright
Figure 5
GUARD INSTALLATION INSTRUCTIONS
1.
Remove power from floodlight.
2.
Place floodlight face up.
3.
Carefully align guard with four (4) screw holes on each side of the fixture shown
in the image above.
4.
Install screws provided with guard, taking care to not scratch the finish of the
floodlight. Torque to 19 in.-lbs. (2.2 N-m).
5.
Install floodlight per above instructions.
NOTE: Guard can be installed before or after floodlight has been in operation.
2015, Eaton's Crouse-Hinds Division
®
With Guard Only
Figure 7
Page 3

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis