Herunterladen Inhalt Inhalt Diese Seite drucken

Quax MINI MEZZANINE 0101Q001 Bauanleitung Seite 25

Junior hochbett
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Step 4.5 : Use the mounted parts from previous steps, the crossbar EB7 and four wood screws H
Push the bed sides (AB2 and AB3) and the crossbar (AB4) with their wooden dowels into the drillings and over the con-
nectors of the left-hand head board (AB1-L). Tighten the maxifi xes. Push the right-hand head board (AB-2R) with its
connectors into the holes and over the wooden dowels of the sides and the crossbar. Tighten the maxifi xes. Place the
crossbar (EB7) in the middle at the bottom of the supports. Push two wood screws (H) into the drillings on the outer edges
of the crossbar and screw into the supports.
Quax nv Karel Picquélaan 84 B-9800 Deinze Belgium T
MINI MEZZANINE 0101Q001
T
0032 9 380 80 95
Step 4.6 : Use the assembled bed,
the slatted bottom EB8 and six
wood screws G
Place the slatted frame (EB8)
on the supports. Push the wood
screws (G) into the provided holes
of the bottom and tighten them into
the supports.
25
www.quax.eu - E
E
info@quax.eu

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Mini mezzanine 0101q0016

Inhaltsverzeichnis