Herunterladen Inhalt Inhalt Diese Seite drucken

Checks Before Powering Up The Control Unit; Putting The Equipment Into Operation - IBC control MicroMax180 Handbuch

Steuereinheit für rotierende wärmetauscher
Vorschau ausblenden Andere Handbücher für MicroMax180:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

CHECKS BEFORE POWERING UP THE CONTROL UNIT

Check that
Check that
Check that
Check that

PUTTING THE EQUIPMENT INTO OPERATION

Should be done in sequence.
Check that
Adjustment of max.
speed
Checking minimum
speed
Checking the cleaning
function
Checking the rotation
monitor
Finish by
the control unit is connected as per instructions on page 10.
Input voltage 230-240 V +/-15%, 50/60 Hz.
the motor is wired for 3 x 230 V. If there is an operating switch between
the motor and the control unit, the motor thermal contact should be
connected via the auxiliary terminal in the operating switch.
the input signal is 0-10
V.
the cleaning function and rotation monitor DIP switch are set to ON.
the motor rotates in the right direction in relation to the wheel's direction
of rotation.
In the event of a fault, switch two phases to the motor.
Set the High Speed DIP switch to the ON position.
Adjust "Max. speed" so that the wheel rotates at 10-12 rpm
(or as per directions from wheel manufacturer).
After a test run, set the DIP switch to OFF.
Set the Low Speed DIP switch to ON.
Check that the wheel starts.
The minimum speed is preset.
After a test run, set the DIP switch to OFF.
Switch off the voltage.
Make sure the "Cleaning" DIP switch is set to ON and the input signal is
disconnected.
When power is switched on, the wheel will rotate at minimum rpm for
10 seconds.
The yellow Rotation LED will flash when the magnet passes
the magnetic sensor, regardless of DIP switch position.
having the control unit drive the wheel at maximum and minimum
rotation speed and checking that the wheel speed is correct.
11

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

F21018201

Inhaltsverzeichnis