Commissioning
9
Commissioning
Check the device before commissioning!
To ensure the correct operation, check the device before commissioning.
Before commissioning, ensure that:
no components are damaged
X
the device has been installed according to regulations
X
there are no foreign bodies inside the device
X
all detachable connections have been tightened firmly
X
the prescribed tightening torques have been observed
X
connection has been made correctly.
X
10 Maintenance, overhaul and repair
Check the device at regular intervals!
To ensure the correct operation, check the device at regular intervals.
The inspections must be carried out according to the national regulations or
IEC/EN 60079-17.
The following details must be checked during maintenance:
Cables are held securely in place
Compliance with the permissible temperatures (according to IEC/EN 60079)
Damage to the enclosure and seals
All detachable connections are held securely in place
10.1 Short-circuit in the main circuit
After a short circuit in the main circuit, the switch must be replaced!
Replace the switch after each short circuit in the main circuit, since with
hermetically sealed equipment the state of the switching contacts cannot be
checked.
10.2 Replacement
Observe operating instructions of the complete unit!
For replacement of the device observe the data of the complete unit.
11 Disposal
Observe the national waste disposal regulations.
8
Control switch group/
Load disconnect switch
8008
WARNING
WARNING
WARNING
WARNING
128641 / 8008603300
2013-04-11·BA00·III·en·04