Herunterladen Inhalt Inhalt Diese Seite drucken

Norwood LumberMate LM29V2 Anleitung Seite 16

7,5 kw / 4 kw elektromotor
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

EN–12
MILL-ELEC-S1-MANEN (2021-07-14).indd 12
MILL-ELEC-S1-MANEN (2021-07-14).indd 12
Install the sheave and secure it with the
bushing onto the motor shaft. Secure it using
the 3 bolts provided inside the box of the
bushing.
(Before installing the drive belt, refer to the
owner's manual to install the Bandwheel and
tensioning system of your sawmill)
Install the drive belt over the drive
bandwheel.
Route the drive belt over the idler pulley,
then over the sheave.
Check belt alignment with the bandwheel,
idler pulley and sheave.
Make any slight adjustment if necessary.
2021-07-14 3:54:04 PM
2021-07-14 3:54:04 PM

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis