Herunterladen Inhalt Inhalt Diese Seite drucken

Norwood LumberMate LM29V2 Anleitung Seite 13

7,5 kw / 4 kw elektromotor
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Assembly
Before assembly, inspect parts to detect any apparent
damage. If there is damaged or missing parts, inform
Norwood Sawmills immediately.
Note: these instructions are used to assemble the electric
package for your sawmill. Some parts and pictures might not
be identical to your sawmill but are similar.
Please use these instructions in conjunction with your
sawmill manual.
For LumberPro HD36v2 Owners — Before You Start!
One part called "Rear leg assembly (HD36) – Spacer"
#LM34-C0220-SPC of the 7.5kW-400v electric package has
to be installed in two locations during the assembly of your
LumberPro HD36 carriage. This part must be installed before
the step shown below, found under "Carriage Assembly" in
the LumberPro HD36v2 manual:
MILL-ELEC-S1-MANEN (2021-07-14).indd 9
MILL-ELEC-S1-MANEN (2021-07-14).indd 9
Installation Requirements
Electrical system providing a residual current
device with a maximum residual current of 0.03A
should be provided. Installation of over-voltage
protection is needed.
Steady state voltage: 0.9-1.1 of nominal voltage
(400V~).
Frequency: 0.99-1.01 of nominal frequency
continuously;
0.98-1.02 short time.
HVF: ≤0.02
Install the left (186) and right (187) rear leg
assemblies, LOOSELY. DO NOT TIGHTEN
ANY BOLTS YET.
Use 3/8 x 3/4" flange bolts (33A). Finger
tight only.
See Trailer Assembly section if
assembling a sawmill with trailer
package.
The part #LM34-C0220-SPC has to be
installed as per the picture here using the
3/8" x 1.0" bolts and 3/8" nylon lock nut.
Then continue the assembly of your
Norwood sawmill as per the owners manual.
EN–9
2021-07-14 3:54:03 PM
2021-07-14 3:54:03 PM

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis