Herunterladen Inhalt Inhalt Diese Seite drucken

Before The First Operation - Klarstein Coolerush Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
EN
22

BEFORE THE FIRST OPERATION

Fastening the rolls
Before first use, the rollers must be attached to the front and back of the
device.
Filling the water tank
Note: In principle you can use your air cooler at any time without water in the tank.
It will then work like a normal fan. Water in the tank is only needed for the cooling
function. The air cooler evaporates this water via the nebulizer fleece. Heat is
extracted from the air and the air temperature of the fan is reduced by up to 3 °C,
depending on the cold of the water used. We advise against using the cooling
function on days with particularly high humidity, as it increases this humidity and can
contribute to circulation problems.
Use of the ice box
The ice box serves to slowly absorb the heat in the water and thus cool down the water
temperature in the water tank for several hours, so that the air blown out by the air
cooler seems a little cooler.
Place the ice box in the refrigerator freezer until it is completely frozen. Place a frozen
ice box in the water tank of the air conditioning fan (the box on the left side of the water
tank). Slide the water tank back into place. After about ten minutes the ice box will have
cooled down the water in the water tank. This appliance is equipped with two ice boxes
to ensure continuous use.
If you want to use the cooling and
humidifying function, fill water into the
water tank. First pull out the water tank
at the back of the appliance and then
slowly fill the water into the tank.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

1003582410035825

Inhaltsverzeichnis