Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Useful Information; Maintenance - CombiSteel 7071 Serie Gebrauchsanweisung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

The Minibar must be level on both directions.
There should be 20mm.dearance to the wall.
Ventilation must be provided as shown in alternatives A, B, C or D.
The ventilation duct must be at least measure 105mmx the width of
Minibar.
Only the entire cooling unit must project into the duct as shown.
Air passing through the duct must not be preheated by any source of
heat.
Ventilation grills, if used, must have openings of at least 200cm2.

4. Operation

Initial Operation:
Be sure that the device must be plugged into a properly earthed socket. The Minibar achieves it operating
temperature after several hours. The operation is silent.
Temperature Control:
The Minibar is fitted with temperature control. The control button is situated inside the appliance

5. Useful Information

Do not fill the appliances inside too much so that it can operate efficiently. This appliance can cool products to a
maximum of 25°C under the ambient temperature.

6. Maintenance

Always pull out the mains plug before cleaning and maintenance. Do not use abrasive cleaning material and hard
object. If power supply cord is damaged, please inform your dealer.
5
www.combisteel.com

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

7071.00057071.00157071.00207071.0030

Inhaltsverzeichnis