Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Checking The Maximum Flow Rate; Specification; Dimensions And Connections - STIEBEL ELTRON WKM Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für WKM:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
INSTALLATION

Commissioning

1 Butterfly valve with adjusting screw
2 WKM
3 WDM
4 WBM
f Fit the following onto the tap body:
f
- WKM: Pivoting spout
- WDM: Shower hose with retainer for hand shower
- WBM: Pivoting arm with shower hose and retainer for hand
shower
14
| WKM | WDM |WBM
8.
Commissioning
f Thoroughly flush the cold water supply line.
f
f Filling the water heater: Open the DHW valve.
f
f Wait until water flows from the outlet, then switch on the
f
water heater.
8.1

Checking the maximum flow rate

1
Material damage
!
With non-pressurised water heaters, observe the max-
imum permissible flow rate when the tap is fully open
(see chapter "Specification / Data table").
f If the flow rate exceeds the stated value when the
f
tap is fully open, reduce the flow via the butterfly
valve in the wall connection.
f For this, remove the cap and turn the adjusting
f
screw clockwise with a screwdriver.
2
9.

Specification

9.1

Dimensions and connections

WKM
100
3
4
220
100 (70)
G 1/2
150
www.stiebel-eltron.com

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

WdmWbm

Inhaltsverzeichnis