The appliances featuring an electric oven have a hole for the cable "Q"
(pic .1).The appliance can be installed alone or in line. Respect a
minimum distance of 80mm between the appliance and any wall made
of flammable material, partitions, kitchen furniture or nearby equipment.
The contact surfaces must be covered with non-combustible heat
insulating material.
When checking for leaks do not use naked flames!
The manufacturer shall not be held responsible and the guarantee is void in case of damage caused by negligence in following
the operating and installation instructions or by improper use. The guarantee is void in case of connections that don't meet the
current standards and fire-fighting regulations.
This equipment doesn't need to be connected to a flue, but we do recommend installing it under an extractor hood.
The distribution network pressure must meet the following
specifications:
ALLOWED
LPG
NOT ALLOWED
ALLOWED
METHANE
H
NOT ALLOWED
If the gas distribution network pressure on the installation site doesn't
meet the above values, inform the gas board and do not turn the unit on
until the reason has been found and eliminated.
Before proceeding with the electrical connection, check the technical
specifications on the data plate. The appliance is not supplied with a
power cable.
The installer must make the connection after having installed a main
switch: it must be easy to reach and must omnipolarly shut the power
off; the connection has to respect the minimum distance of at least 3
mm between the poles.
The power cable must meet the minimum standards of H07 RN-F and
have a minimum section see tab. pag.3; it must not be installed near
heat sources and the temperature of the place in which the appliance is
installed must not exceed 50°C. To reach terminal board "M" (pic.1.1)
pull the knobs off and remove the frontal panel "H". Following the
The manufacturer refuses all responsibility in case of damages caused by wrong installation, inaccurate maintenance and inobservance of the
safety regulations.
Evacuation of burnt gases
Checking the pressure
From 20/25 to 35/45 mbar
Below 20/25 above 35/40 mbar
From 17 to 25 mbar
Below 17 above 25 mbar
Connection to the electrical distribution network (models G9)
The appliance, and especially the cable, must not be installed near heat
sources and the temperature of the place in which the appliance is
installed must not exceed 50°C.
After having installed the appliance, check for any leaks in the fittings.
While looking for leaks, we recommend using non-corrosive foam
products, such as leak detection sprays.
The distribution network pressure can be taken with a U manometer
(min. definition 0.1 mbar), connected to the pressure outlet behind the
control panel "H" (pic.11).
1.
Remove the control panel.
2.
Remove the screw and the washer (pic.11) from the pressure outlet
and connect the manometer.
3.
Turn the unit on following the enclosed instructions and check that
the pressure is within the permitted pressure range.
4.
Disconnect the manometer and replace the screw and the washer
in the pressure outlet.
5.
Replace the control panel.
indications in the wiring diagram, connect the wires of the power cable
to the terminal board. The appliance must be connected to a good earth.
For this purpose, you will find the earth terminal on the terminal board,
identified with the
connected. Slide the cable near the terminal board, hold the cable in
place until you can block it with the proper cable clamp "Q" (pic .1).
The appliance must also be connected to an equipotential earth. This
connection can be made using the equipotential terminal marked with
the symbol
, placed on the rear side of the appliance.
The equipotential wire must have a section of 10mm
GB / IE - 2
symbol and to which the earth wire must be
.
2