3. Connect the power supply and signal cables according to the different models
L N
L1 L2 L3 N PE
L N
L1 N PE
ALIMENTAZIONE
ALIMENTAZIONE
COLLEGAMENTO
COLLEGAMENTO
ALIMENTAZIONE
ALIMENTAZIONE
COLLEGAMENTO
COLLEGAMENTO
ELECTRONIC POWER
MAIN POWER
DLM
REMOTE CONTROL
ELECTRONIC
MAIN POWER
DLM
REMOTE CONTROL
ELETTRONICA
PRINCIPALE
DLM
REMOTE CONTROL
ELETTRONICA
PRINCIPALE
DLM
REMOTE CONTROL
SUPPLY
SUPPLY
CONNECTION
CONNECTION
POWER SUPPLY
SUPPLY
CONNECTION
CONNECTION
4. Once the electrical system is complete, the system is ready to be turned on.
If the station identifies a malfunction, the front status LED will turn red.

7.2.3. INSTALLATION AND CONFIGURATION OF THE ENERGY METER

The use of the operating mode called DLM requires the pre-arrangement of the electrical system as indicated
below. If this is not done, this mode cannot be used.
The first requirement is the presence of an energy meter (code GWD6812 or GWD6817) in the electrical system.
This device must be installed downstream of the main switch (usually a residual current circuit breaker) and up-
stream of all the various circuit breaker protections installed in order to measure all domestic loads.
Main switch
Dedicated energy meter
High domestic load
protection devices
Charging station
protection devices
53

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis