7.0 Start up
Remove desiccant bag from JB before starting up.
Before the initial start-up of the heater, the following will have to be checked:
1. The applied voltage is according to marking plate.
2. The electrical connections are performed in accordance with the relevant standards
and wiring schematics.
3. The heater is properly installed, and all studs and nuts are properly tightened.
24
08099905