Controls

46
Instruction Manual – Verdanium Home – Ver. 2.1.1 – 12.2020

Control buttons

The Verdanium Home is controlled by using the
keypad. The following functions are available:
System activation
System deactivation
Check system operation time
Reset filter change interval

Display

The display shows various functions and opera-
ting status of the Verdanium Home:
Status of the system
Information about filter change
Rinsing times
Operating times
Error messages

Interface

The interface is used to update the software of
the Verdanium Home.
Please note that this interface is only to be
accessed by authorised service providers. Any
interference with the control system irrevocably
leads to the loss of warranty.
After installation, you must put the system into operation. Please select in the operation mode menu the
IB program (commissioning program).
Navigate with the ( + ) or ( – ) buttons to select the operation mode, Press the
Operating Mode:
Button
Select display
with "+" or "-"
This operating mode (IB program) assumes that the Verdanium Home is correctly connected. The water
inlet and the withdrawal tap must be open.
During the first phase of commissioning the Verdanium Home will rinse the pre-filters.
Filter rinse
Automatic
ESC ←
030%
While rinsing the membranes, the disinfectant is removed from the membrane and drains into the waste-
water tube connection.
During the last phase of commissioning, the Verdanium Home rinses the ultra-pure water side of the mem-
branes and the post-filters.
Permeate rinse
Automatic
ESC ←
060%
When the IB program is completed, and the withdrawal tap is open, the Verdanium Home changes automa-
tically to permeate production. Continue operating the Verdanium Home for additional 7 - 10 minutes to
flush out any remaining disinfectant residues.
The Verdanium Home is now ready for use.
Instruction Manual – Verdanium Home – Ver. 2.1.1 – 12.2020

First commissioning

OK-Button.
IB-PROGRAM
ESC ←
→ OK
Membrane rinse
ESC ←
090%
PERMEATE PRODUCTION
device in operation
ESC ←
47