Commissioning several net-
worked units
System with several inverters
IPE 2700 - 5000 SN 05
Confirm the time with
NOTE
Please note that time settings should only be made with caution, as they directly af-
fect data logging. For example, if you set the time back by 1 hour, then the existing
data will be overwritten.
6. Setting a password. Select Password with
******** (= 8 asterisks)
A new password can be set with
Confirm the password with
NOTE
Please note:
Only digits between 0 – 9 and letters between a – z and A – Z are permitted.
The password always has 8 characters. If the password you entered has less than
8 characters, the remaining characters will be filled with "*".
Example:
The password you have chosen is "Solar". This password has 5 characters. The sys-
tem automatically adds three "*", so that the password becomes "Solar***".
7. Completion of commissioning
Confirm overview with
Master
1
Before commissioning, all units must be interconnected via the CAN bus interface.
See the chapter on networking inverters via CAN bus.
Switch on all units following installation. Start commissioning with the unit you selec-
ted as the master.
.
. The default password is:
/
/
/
.
.
Slave
2
2
Commissioning
as an option.
1