Herunterladen Inhalt Inhalt Diese Seite drucken

Lovato T-FAST ie40 Montage- Und Wartungsanleitung Seite 21

Frischwasserstationen
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Energy supplier
Energy supplier
(optional)
PRELIMINARY CHECK
Before every operation carefully remove the packaging and verify if there is external damages. In case of damages please do not install the products.
Dispose the packaging parts in compliance with the local regulations.
The product is supplied by the manufacturer completely screwed. The transport or a long stock may not grant the seal. Please check the seal before the
!
filling of the system
All the operation must be done with power supply disconnected to the electricity grid
!
The installation must be done in compliance with the local regulations
!
The responsibility of the manufacturer shall be limited to the products. The installation must be carried out by qualified personnel
!
ASSEMBLING AND COMMISSIONING
!
The module is designed for the distribution of the water into the heating and DHW production systems.
The installation, setting and maintenance of the appliance must be performed by professionally trained and qualified personnel, with
!
the professional prerequisites.
!
The place of the installation must be dry and the ambient temperature must not exceed 40°C.
!
Connect the pipes of the system respecting the connection as indicated in the section 3.
Handling with care!
!
Assembling instrunctions and maintenance
SECTION 4: EXAMPLE OF USE
Puffer
SECTION 5: INSTALLATION
T-FAST ie 40
DHW outlet
Recirculation
DCW
inlet
21

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis