Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Wiring; Checking The Wiring - KESO Assa Abloy Integra Installations- Und Montageanleitungen

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN
28

Installation

Wiring

For safe operation, the maximum cable lengths and cable specifications must be
observed ("KESO cable, 4-wire", page 34).
A function check must be carried out after each additional installation.

Checking the wiring

1
Check the connections before switching on the supply.
 Never connect mains voltage (115/230 V) directly to any connections of the
KESO Integra Relay Board.
 Bare areas or damaged insulation on the cables must not be visible.
 The protective cover must be installed before commissioning.
Work on the mains voltage (115/230 V) may only be carried out by authorised
specialist personnel.
For safe operation, the maximum cable lengths and cable specifications must be
observed.
Installation

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis