Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance Plan Bc - Union Special BC200 Serie Originalbetriebsanleitung

Hochleistungssackzunähmaschinen korrosionsgeschützte teile
Inhaltsverzeichnis

Werbung

MAINTENANCE PLAN BC 200

Daily at the beginning of shift work
1.
Check oil level at oil gauge glass after closing 30 to 40 bags..
2.
Check oil pressure at running motor. The oil pressure has to be 0.3 to 1 bar (4 to 15 PSI).
Daily at end of shift work:
Clean sewing machine with compressed air!! For cleaning open looper cover and looper thread cover. Blow out sewing
machine with a compressed air-pistol.
18

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis