Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly; Operation - Westfalia 92 32 71 Originalanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Charge the battery for approx. 8 hours. Afterwards you can charge the
battery for approx. 6 hours.
When the battery is fully charged, the LED lights up green.
3. After charging process, disconnect the charger from the unit and
unplug from mains.

Assembly

1. Before each use, check the pump for any
damages. Do not use the pump in case of
damages.
2. Place the sealing washer (10) on the pump
housing (7) and screw the nut (6) on the
housing.
3. Tightly attach the hose (not included) to be used
for pumping off the water to the quick connec-
tion of the shup-off valve (1).

Operation

1. Set the rain barrel pump on a flat
surface into the water supply you want
to pump off. Make sure that the pump
cannot move during operation.
Pay attention to the maximum sub-
mersion depth. Always make sure that
the suction opening (8) is not blocked
or obstructed during operation.
If necessary, place the pump on a
brick or similar.
2. Run the irrigation hose for watering the
plants. Observe the maximum delivery
height.
3. Open the shut-off valve (1).
Using
17
6
10
7

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis