Herunterladen Diese Seite drucken

Selection Of Industrial Ethernet Protocol; Mechanical Installation - Grundfos E-Box 500 Installations- Und Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für E-Box 500:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 14

3.2.2 Selection of industrial Ethernet protocol

The industrial Ethernet protocol can be set via the
rotary switch. See fig. 4, pos. 6.
Pos.
Description
0
PROFINET IO (factory setting)
1
Modbus TCP
Reserved. LED1 will be permanently red
5...E
to indicate an invalid configuration.
Resetting to factory settings.
Note: Set the rotary switch to this position
F
for 20 seconds to reset to the factory
settings. During this period LED1 will be
flashing red and green.
If the switch position is changed when the
module is powered on, the module
Note
restarts.
3.2.3 Connection of power supply and GENIbus
Prior to connection of power supply and GENIbus,
execute the mechanical installation.
See section
3.3 Mechanical
See fig. 5.
1. Switch off the power supply of the DDA dosing
pump (1).
– Wait for approx. 20 seconds before executing
the next step.
2. Remove protective cap from BUS input of the
pump.
3. Connect plug (4) thoroughly to BUS input of the
pump.
Fig. 5
Connecting E-Box to SMART digital S
DDA
Start-up procedure and wiring diagram of
plug, see installation and operating
instructions of the SMART digital S DDA
Note
dosing pump.
The functional profile can be found on the
product CD delivered with the E-Box.
installation.

3.3 Mechanical installation

The E-box is always mounted below the pump
regardless of the pump's mounting position (e.g. wall
or tank mounted). See fig. 6.
1. Place pump on E-Box.
– Make sure that the clamps of the E-Box
housing cover engage at pump housing (detail
1).
– Insert locking device (5) at pump housing
(detail 2).
2. Tighten screw (4) to lock connection (detail 3).
Fig. 6
Mounting pump on E-Box
For horizontal installation, the E-Box can be mounted
on the mounting plate of the DDA dosing pump. See
fig. 7.
Fig. 7
Mounting E-Box on mounting plate
7

Werbung

loading