Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning, Operation - Tecsis P2600 Betriebsanleitung

Differenzdruckmessgerät
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7. Commissioning, operation

Switch point adjustment
Preference should be given to setting the switch point before installing the
measuring instrument. The necessary test path is generated manually (e.g. by
means of an antimagnetic screwdriver).
Manual test path generation
GB
The switch point can also be set in a pressurised condition after installation. The
switch points are set at the factory when the set points are given.
The switch point is adjusted by turning the contact adjustment screws on the
outside of the reed case.
Zero point check
In general, the zero point should only be checked and adjusted at zero pressure.
The system fastening lug on the back of the case can be easily slackened off for
zero point correction of the pressure gauge. Now the zero point can be readjusted
by moving the measuring system to the right or left. After this has been done the
measuring system is to be secured again by means of the fastening lug (max.
tightening torque of the mounting screw 2.5 Nm).
22
Anticlockwise rotation:
Switch point can be moved in the direction of the
start of the measuring range
Clockwise rotation:
Switch point can be moved in the direction of the
end of the measuring range
Plus media chamber
antimagnetic
Operating instructions

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis